Page Title

themed image
 
   

 


 

 

 

 

 

Geothermal bed

The first row of ICF's are stacked and then the slab is poured

A completed wall with the bracing in place before pouring

A modular section is readied for lifting

Geothermal bed

Modular has been assembled. A tarp has been placed in case of rain. Will return tomorrow

to finish.

The second home in our Augustine Pond subdivision

View of Augustine pond from the deck of the second home

Augustine Pond - a 2 acre man made lake

View of the second home from the deck of the first home

Augustine Pond

Augustine Pond

The first home in the Augustine Pond subdivision

Another view

The rear of the first home in the Augustine Pond Subdivision

Interior

Interior

Our homeowner has good taste

Interior framing in a log home

The foundation is in and we are ready to build

Building in the winter isn't always fun

Log home roof framing

Ridge beam is erected first

Ready to frame cathedral and prow

Perched on the mountain

Log stack is complete

View from below

A modular section is set in place

Putting the pieces together

The roof being raised

One case where your house flying through the air is a good thing

The basement columns

Set is complete and ready for carpentry crew

Another of our log homes

Ready for move in

One of our nicest modulars

Just completed modular

Waiting for the grass to grow

Scott and John putting the finishing touches on a drop ceiling

State of the art heating and cooling system

Some cultured stone work

Composite decking and copper gutters

Custom log truss

One of our most popular modular styles

Hammering rock for a foundation

Dad trucking

Carl doing what he does best

A long stick excavator

It can reach really far

We did the stage expansion and dressing room addition for the Woodstock Playhouse

A completed ICF foundation with a protective layer over the waterproofing.